Motivation

Why pair data centers with renewables stuck in the queue

Utility-scale clean energy is waiting years for grid approval, while AI data centers are hunting for power right now. Matching them is how we unlock capacity years faster.

Utility-scale renewables are getting stuck in grid interconnection queues for up to nine years.

According to Lawrence Berkeley National Lab, there is now over 2,300 gigawatts (2.3+ terawatts) of generation and storage capacity trapped in U.S. queues—the vast majority of it clean energy.

As Tim Hade highlighted on a recent episode of the Catalyst podcast with Shayle Kann, clearing these regional transmission queues can take about four years in ERCOT, six years in PJM, and up to nine years in CAISO.

Let that sink in: over 2.3 terawatts of clean power waiting nearly a decade for grid approval, while AI data centers are desperately searching for power right now.

Tech giants are already pivoting to bypass this exact bottleneck. Take Google: instead of waiting years for standard utility grid connections, they partnered with Intersect Power to build massive co-located “energy parks.” By placing data centers directly alongside newly built solar, wind, and battery storage, Google draws power behind the meter—bypassing transmission queue delays, reducing grid loss, and bringing capacity online years faster.

Which begs the obvious question: why let clean energy sit idle?

Instead of waiting on grid infrastructure that’s years behind, we should be pairing upcoming data center loads directly with renewable projects. Co-locating or matching them solves two major headaches at once:

That’s why I built energy.munjr.com — a matchmaking platform designed specifically to pair data center projects with available and upcoming renewable energy assets.

If you’re a clean energy developer looking for an off-taker, or a data center operator looking to bypass grid bottlenecks, explore the live pairings: